The Vieux Carré Commission, the HDLC, the 50% Rule, the ICC elevation grant, the permit types, the timelines. The NOLA-specific stuff that out-of-town contractors miss and that nobody else has written down in one place.

Articles

VCC process explained: 7 steps from concept to certificate of appropriateness

v1.1 expansion, full body ships post-GO.

More in the blog →

HDLC Uptown: the 5 most-commonly-cited violations and how to avoid them

v1.1 expansion, full body ships post-GO.

More in the blog →

The 50% Rule: when a reno triggers full-code compliance (and how to plan for it)

v1.1 expansion, full body ships post-GO.

More in the blog →

The ICC elevation grant: $30K toward raising your house post-flood

v1.1 expansion, full body ships post-GO.

More in the blog →

Permit types in NOLA: which one do you actually need?

v1.1 expansion, full body ships post-GO.

More in the blog →

Permits & codes FAQ

Do I need a permit to renovate my NOLA home?

Almost always yes. The City of New Orleans requires a building permit for any structural, electrical, plumbing, or HVAC work. The permit goes through the Department of Safety and Permits. We pull the permit for you as part of our SOW.

What's the Vieux Carré Commission (VCC)?

The VCC reviews exterior changes to properties in the French Quarter. They have jurisdiction over the entire exterior envelope: paint color, doors, windows, roofing material, balconies, fences, signs. Interior work is generally not reviewed. Approval typically takes 4-8 weeks.

What's the HDLC?

The New Orleans Historic District Landmarks Commission (HDLC) and the Central Business District Historic District Landmarks Commission regulate local historic districts and individual landmarks outside the Vieux Carré. Review requirements depend on the property's jurisdiction, applicable controls and proposed work. A short neighborhood list is not a jurisdiction check. Look up your address in the City of New Orleans Property Viewer and contact HDLC if you are unsure whether your project needs review; the Vieux Carré is handled separately by the Vieux Carré Commission (VCC).

What's the 50% Rule?

If the cost of your renovation (in any 12-month period) exceeds 50% of the structural value of the building, the entire structure must be brought up to current code. This is a major scope and cost amplifier. We model the threshold in our fixed quote so you know the trigger before signing.

Do I need an architect for a permit?

For cosmetic or non-structural work: no. For additions, structural changes, or work in VCC/HDLC jurisdiction: yes, an architect stamps the plans. We have architect partners we work with regularly; their fee is in the SOW.

How long does a NOLA permit take?

Routine interior work: 2-4 weeks. Structural: 4-8 weeks. VCC/HDLC review: add 4-8 weeks on top. Hurricane-recovery work after a declared disaster: 1-2 weeks under expedited FEMA review.

What about the ICC elevation grant?

If your property was substantially damaged by flood and you have an NFIP policy, you can claim up to $30,000 from the ICC (Increased Cost of Compliance) grant toward elevation. We help you apply and coordinate the elevation work with the rest of the rebuild.