Service page: Solar, battery and generator backup power
What green energy means for a Louisiana house
Roofs here take more sun than almost anywhere in the country, and the grid takes more punishment than most. That combination is why green energy in southeast Louisiana is less about ideology and more about keeping the lights on in August. The equipment that produces and stores energy at a house is the same equipment that carries it through an outage.
This page is the map. Each section below summarizes one part of a home energy system and links to the page that goes deeper, because one page cannot answer a question about a generator and a question about a well pump at the same depth.
The four parts of a home energy system are solar, a battery, a standby generator and a transfer switch. A house can have one of them, or two, or all four. What changes from house to house is the size and the sequence of the energy equipment, not the idea.
Solar: the array and the roof above it
Solar panels turn daylight into direct current, and an inverter converts that to the alternating current a house runs on. On a clear Louisiana afternoon an array produces more energy than the house consumes, and the surplus either goes to the utility or charges a battery, depending on how the system is wired.
The roof matters as much as the modules. A solar energy system is a twenty-year commitment bolted to a surface with its own remaining life, so we inspect the roof, the flashing and the penetrations in the same scope, because we already replace roofs here.
Solar is the part of a home energy system that produces, and the rest of the equipment exists to store, manage or deliver what it makes. The solar, battery and generator backup power service page covers how an array is scoped, permitted and built, and it is the solar spoke of this cluster. It keeps its own address because it has been live since November 2025 and answers a commercial question this overview does not.
Battery backup: the first hours of an outage
A home battery banks the array's output for the evening. When the utility drops, it takes over in milliseconds, so the router stays up and the clocks keep their time. It is quiet, it has no exhaust, and it needs no fuel delivered.
Its limit is duration. Paired with solar it refills each sunny day, which turns a reserve into a resource that repeats. Without an array it is a one-time store of energy, sized for hours rather than days.
The battery backup page covers sizing, the loads a battery can and cannot carry, and where the unit goes on a Louisiana wall. If the question is how a battery compares with a generator, the comparison post takes the two apart.
Standby generators: the long outage
A standby generator sits on a pad beside the house and starts on its own when the utility fails. It runs on natural gas or propane, feeds a transfer switch, and carries whatever circuits that switch controls. Where the gas main stays pressurized through a storm, it runs for as long as the outage lasts.
It is also the part that carries the heavy loads. Central air, a well pump and a shop draw more energy than a battery of ordinary size supplies for long, and a generator sized for them is the difference between a house that survives a week and one that survives a night.
The standby generator page covers sizing, fuel, placement and the maintenance a generator needs. The off grid power page covers the case where there is no utility connection at all, which is a different design problem.
The transfer switch: the part that makes it safe
Every system above depends on one device. The automatic transfer switch separates the house from the utility lines and decides which source the house runs on. Without it, a generator or a battery feeding a house that is still tied to the grid can push energy back onto lines where a crew is working.
The National Electrical Code covers these installations in Article 702, and the switch is why a house can run on its own without energizing the street. It also has to be rated for the whole service, so the electrical service is reviewed before anything is ordered.
The post on what a transfer switch does walks through the device itself, the difference between a transfer switch and an interlock kit, and the questions to ask before a generator is delivered.
Home microgrids: the four parts as one system
Put the array, the battery, the generator and the switch together and the house has what the Department of Energy calls a microgrid, drawn at the scale of one property. The energy system runs connected to the utility, and it runs disconnected from it, inside a clear electrical boundary.
The value of a paired energy system is in the pairing. The battery covers the first hours quietly and picks up again when the sun returns. The generator carries the long middle and the heavy loads. The array refills the battery on an ordinary day, so the system is not waiting on a fuel truck in its second week.
The home microgrid page is the deep treatment: the architecture, what such a system can run, how it is sized, and what it cannot do. Read that one before fixing the equipment list.
Off grid and homestead power
A property with no utility connection is a different problem. There is no grid behind it, so the design has to carry every load on the worst day of the year, and the sizing starts from the winter solstice rather than the annual average. A well pump, a freezer and a workshop move the arithmetic quickly.
The off grid power page covers the design, the storage a homestead actually needs and the practical limits. The post on off grid power for a rural Louisiana property covers the rural version, including wells, propane and the upkeep a remote system demands.
Most houses in the metro do not need this. They need a grid-tied energy system with backup, which is simpler, cheaper and easier to permit. Knowing which of the two you are building is the first decision, and it sets the budget before any equipment is chosen.
Hurricane season and what resilience costs here
The Atlantic season runs from June 1 to November 30. An outage in that window arrives with heat, humidity and a damaged roof, and the repairs often come before the power does. A backup system mounted on a roof that is due for replacement is money spent in the wrong order, so the storm repair and the energy work have to be sequenced.
Resilience is a load list and a duration, not a product. Decide what the house keeps running, decide how many days it should carry itself, and size to that. The hurricane backup power post works through the arithmetic, including the starting surge that decides equipment size more often than the running load does.
Permits, licensing and the electrical scope
In the City of New Orleans a rooftop solar system is an electrical permit, with plan review through SolarAPP+. The permit must be pulled by a contractor holding a Class A Master Electrical Contractor licence from the City, a rule in force since March 2025. Inside a historic district, the HDLC or the Vieux Carre Commission reviews a Certificate of Appropriateness first.
A standby generator brings its own approvals: electrical, fuel, and a siting review that keeps exhaust away from doors and windows. Jefferson Parish and the surrounding parishes each run a separate permit office, and a City licence does not carry across a parish line. The address decides the authority.
Jazzy Construction holds LSLBC Residential Construction License #8725 and works statewide. Electrical work on any of these energy systems is performed by a licensed Class A master electrical contractor, because the City requires that licence for the solar permit. We run the survey, the permitting, the roofing, the schedule and the warranty around that scope.
How a green energy project runs, and how to start
The work starts with a walkthrough and a load list, and those two documents size the energy system. We write down what the house needs to keep running, note the starting surge on the largest motor, and look at the roof and the service. From that we size the array, the battery and the generator, and say plainly what each part will and will not carry.
Then the permits, the install and the inspection. Like every Jazzy Construction job, the scope comes with a written price and a schedule before work starts, and a quote request with the address, photos of the electrical panel and the load list gets a rough estimate within 24 to 48 hours. The bid follows the site review, and if the roof needs work first, we say so before anything is ordered.
What green energy cannot do
Green energy does not make the utility bill disappear, and it does not make a house storm proof. It does not repair a roof, a foundation or a flooded service panel, and it does not carry central air through a week on a single battery.
It also does not bring a federal credit today. The 30 percent Residential Clean Energy Credit applied to property placed in service through December 31, 2025, and for anything installed later we will not quote a figure we cannot verify. Incentive programs change, so we check what applies to your address.
What it does is keep a house livable when the grid goes down, and cut the energy bill the rest of the time. In southeast Louisiana that is a practical question, and it is answered with a load list rather than a brochure.
Common questions
- What counts as green energy for a house?
- At a house, green energy usually means solar panels, a battery for storage and an inverter, plus a standby generator and a transfer switch when the goal is backup through an outage. The generator is not renewable, and it is the part that makes a multi-day Louisiana outage survivable, so the honest answer is a mix rather than one technology.
- Is green energy the same as going off grid?
- No. A grid-tied system treats the utility as an energy bank in the background and disconnects when the utility fails. An off grid property has no connection at all and has to carry every load, every day, from its own equipment. The equipment overlaps and the sizing does not.
- Can I add solar or a battery to an existing New Orleans house?
- Usually yes, and the first question is the roof and the electrical service rather than the panels. A rooftop array is an electrical permit reviewed through SolarAPP+, the permit has to be pulled by a contractor holding a Class A Master Electrical Contractor licence from the City, and a historic district adds a Certificate of Appropriateness first.
- Do you install all of these systems?
- Jazzy Construction scopes and runs green energy projects, solar, battery and standby generator, in the New Orleans metro and across Louisiana. The electrical scope is performed by a licensed Class A master electrical contractor, because the City requires that licence to pull the solar permit.
- Is there a tax credit for solar in 2026?
- The 30 percent Residential Clean Energy Credit applied to property placed in service through December 31, 2025. For systems installed after that date we do not quote a federal credit we cannot verify. State and local programs change, so we check what applies to your address and tell you what we can confirm.
- How do I start on a green energy project?
- Send a quote request with the address, photos of the electrical panel and the service, and a list of the loads you want to keep running in an outage. That is enough for a rough estimate within 24 to 48 hours, and the bid follows a site review.
Sources
- U.S. Department of Energy, Microgrid Systems
- U.S. Department of Energy, Solar Integration: Distributed Energy Resources and Microgrids Basics
- U.S. Department of Energy, Homeowner's Guide to Going Solar
- NFPA 70, National Electrical Code, Article 702 (optional standby systems)
- National Hurricane Center, tropical cyclone climatology
- City of New Orleans, One Stop Shop permits
- Louisiana State Licensing Board for Contractors
- American Red Cross, power outage safety
Rules, programs and prices change. Check the source before you rely on a figure, and ask us to confirm it for your property.