Service page: Foundation repair services
Foundation repair New Orleans: what the published costs show
Start with numbers somebody else measures every year, then adjust them for your house.
HomeGuide's pier and beam foundation repair cost page puts typical repairs at $1,500 to $15,000. It breaks the work into three parts: reinforcing a pier at $1,500 to $3,000 each, leveling at $1,500 to $10,000, and replacing a beam at $1,500 to $4,000.
Those figures assume a house that can be reached. A cottage on a low crawlspace with a full sill to shore up costs more than the page's midpoint, and a house that has to be opened up first costs more again. Nothing on this page is Jazzy Construction's price list. These are named cost guides with a year attached, and the link for each one sits at the bottom.
The order of the work matters more than the number. A foundation estimate that names leveling but never looks at the sill, the beams or the soil under the piers is a number without a plan, and the plan is what the price actually depends on.
What your house sits on
Three foundation types cover almost every house in the metro, and each one fails in its own way.
Slab. The house and the concrete are one object. Repairs mean working under the slab, lifting it, or leaving it and lifting the frame. FEMA's homeowner retrofit guide, P-312, makes a blunt point about slab construction: lifting the concrete along with the house is hard to engineer and often not feasible. A slab was never built to hang between supports, so a slab foundation usually stays behind or comes out.
Pier and beam. A grid of masonry piers or wood posts holds up beams, and the beams hold up the floor. This is the most common foundation on older New Orleans houses, and it is the easiest one to level, because each pier can be adjusted or replaced on its own.
Raised basement. A raised basement foundation puts a masonry perimeter wall around a shallow basement or a tall crawlspace. These are the hardest to lift further, and the city's historic guidelines say as much for the districts they cover.
New Orleans soil does not help. Much of the city sits on soft soils and filled ground, and the water table moves with the season. This site's foundation types guide explains which of the three is most common on which block, and the license and insurance page lists the credentials behind the crew.
The signs a foundation is moving
Houses move a little, and a hundred year old house has moved a lot. The question is whether the movement is active.
Watch for cracks that step along the mortar joints of brick, doors and windows that stick in one season and free up in another, floors that slope away from a wall, and trim that has pulled away from the wall at the same height on both sides of a room. A crack that is wider at the top and narrows downward usually means piers are settling under that corner.
Some cracks mean nothing. Hairline shrinkage cracks in plaster and the odd crack around a window opening are common in a house this old. The pattern, the width and whether the crack is changing matter more than whether a crack exists.
Termites belong in the same inspection. Formosan subterranean termites swarm in the New Orleans area every spring, and their damage shows up first in the wood closest to the ground. A contractor who never looks at the sill has only inspected half of a foundation.
An inspection that means something takes measurements. The inspector levels the floors room by room, notes how far each corner has dropped, probes the sill and the beams for soft wood, and checks the soil and the drainage on the outside faces. Photographs of the same crack taken months apart carry more weight than any verbal description, because they show whether the foundation is still moving or has settled down.
How a repair actually works
Pier and beam leveling is the most common foundation repair on older metro houses. The crew gets under the house, measures how far the floor has fallen from level, then either shims the beams back up on the existing piers or replaces the piers that have failed.
A pier that has cracked, sunk or rotted gets replaced. That usually means a new footing at the right depth for the soil, a new masonry or concrete pier on top of it, and a new connection back to the beam. HomeGuide's $1,500 to $3,000 per pier figure is the working range for that one step.
Beams get sistered or replaced when they have sagged or when termites have hollowed them. A beam that has lost section cannot hold the floor no matter how many piers sit under it, so the beam comes first and the leveling comes after in any foundation repair.
Slab foundation work is a different trade. Some crews pump material under a settled slab to lift it back toward level. That fixes a slab that has dropped as a unit. It does not fix a slab that has cracked and broken, and it does not fix the framing above it.
Leveling is not the same as perfect, and nobody who has worked under these houses promises a floor that comes back dead flat. A good job leaves the foundation carrying the load evenly again, the doors closing, and the floor where it sits. Where the old finish has to come up to get there, that belongs in the price before the work starts.
One more thing to hold a contractor to on any foundation repair: the water. Grading that sends runoff toward the house, a downspout that ends at the wall, or a leak under a kitchen sink all feed the conditions that move a foundation. Repair without that fix is a repair that comes back.
Sill plates and the wood at the bottom
The sill plate is the piece of wood that sits directly on the piers or the perimeter wall, and every joist and stud in the house rests on it. When a sill rots, the house above it settles exactly as much as the rot allows.
HomeGuide prices sill plate replacement at $120 to $200 per linear foot, or $6,000 to $10,000 for 50 feet. HomeAdvisor's 2025 figure for the same work is lower, at $100 to $120 per foot. The spread comes from access, the length of the run and what has to come out of the way first.
Length is what catches people in this market. A shotgun is long and narrow, so its two long side sills add up to a lot of footage, and a full replacement on that footprint is a larger job than the same work on a square house of equal floor area.
Termite damage and rot often show up in the same repair, because the conditions that rot wood also suit termites. Budget for the sill when the inspection finds soft wood at the bottom of a stud, and expect the scope to grow once the old wood is out and the framing behind it can be seen. A soft sill is a foundation problem in its own right, even when every pier under the house is sound.
When repair is not enough: house raising
Sometimes the ground under the foundation is the problem. A house that floods repeatedly, or that sits below the required elevation for its flood zone, can be cheaper to lift than to keep repairing.
FEMA's P-312 guide describes the method step by step: separate the house from its foundation, jack it up, hold it on temporary supports, build a new or taller foundation underneath, then set the house back down. On a pier house that sequence follows the structure the house already has. On a slab it is a much bigger undertaking.
Fixr last revised its raising guide on January 31, 2025, and the national spread it publishes is $25,000 at the low end and $100,000 at the high end, with a $50,000 typical job. Angi's 2025 numbers sit lower: $20,000 to $80,000 to raise a flood zone home, and that band already includes the pilings, the engineer's stamp, the plans and the municipal paperwork. Per square foot, Fixr puts the lifting alone at $10 to $35, and the lifting plus a replacement foundation at $14 to $60.
In Louisiana, the number moves with four things: the foundation the house already has, the height the flood map and the parish require, the condition of the old framing and the plumbing, wiring, gas and ductwork that have to be extended to the new height. The house raising page states the metro range we price from, $30,000 to $120,000+ depending on size, foundation type and what happens at the lower level.
A lift is also a demolition-and-rebuild of every connection between the house and its foundation. Steps, porches, fences, driveways and landscaping are part of the budget. So is the finish work where the house meets its new foundation.
How high a raised house has to sit
The flood map sets the floor. The base flood elevation, FEMA's BFE, is the water surface that a storm has a 1 in 100 chance of reaching in any given year. Building above it by a margin is called freeboard, and almost every local ordinance in this region asks for a margin.
New Orleans has run its own version since June 1, 2016. For new buildings and substantial improvements, the ordinance demands whichever is higher: a foot above the mapped BFE, or 3 feet measured from the highest curb next to the lot. Lafayette's floodplain office asks for a foot above BFE for the lowest floor and for mechanical equipment. Each parish publishes its own numbers, so the answer is parish specific.
Find your zone first. Look the address up on the FEMA Flood Map Service Center and keep a copy of the panel. New Orleans also holds elevation certificates for many properties and sends a copy at no charge.
An elevation certificate records the finished floor height, the lowest adjacent grade, the garage and the mechanical equipment once the work is done. It is the document the floodplain office and the insurance carrier both read, and a licensed surveyor or engineer prepares it. Put the target height on the plans in writing before the new foundation goes in, because moving it later is expensive.
The height has a cost curve. Every extra foot of elevation means another course of foundation, longer stairs, more pipe and more wire. The right height is the one the parish enforces plus the freeboard insurance credits reward, not a round number.
Paying for a repair or a lift
Homeowners insurance rarely helps with a settling foundation. Most policies exclude earth movement and gradual settlement, and they treat long term water damage differently from a sudden break. Flood policies are separate, and a standard homeowners policy does not cover flood at all.
Two programs do pay for elevation when the house qualifies, and both are worth reading before anything is signed. The first is Increased Cost of Compliance, an allowance built into every NFIP flood policy. Its ceiling as of November 2026 is $30,000 toward the work of bringing a substantially or repetitively damaged house up to code. Two clocks run on it: FloodSmart puts the proof of loss deadline at 60 days from the parish's damage notice, and completion at six years from the date of loss.
Grant money arrives through local government rather than straight from FEMA. Flood Mitigation Assistance is applied for by the parish, routed through GOHSEP, and the FY 2026 cycle closes February 26, 2027 per the Association of State Floodplain Managers. Hazard Mitigation Grant Program money appears only after a presidential disaster declaration, and elevation of a structure is one of the project types GOHSEP accepts.
Timing matters as much as the program. A foundation inspection and an elevation certificate cost far less than a stalled lift, and a parish that already has your elevation on file can move on a grant list faster. Ask the parish floodplain office what it holds and what it needs before you call a lift contractor.
Build the funding before the contract. A parish that is assembling an FMA list this month is a parish worth calling this month, because the state's internal deadline always comes earlier than FEMA's.
Permits, codes and historic review
Foundation repair under a house often needs a permit, and a house raising always does. The parish issues it, and the parish also enforces the floodplain rules that decide the finished height.
Louisiana is set to adopt the 2024 editions of the international codes on January 1, 2027, according to the Louisiana State Uniform Construction Code Council's published schedule. Work permitted under the current code will be inspected under the code in force when it is permitted, so the timing of the permit is worth planning.
Inside a New Orleans historic district, the Historic District Landmarks Commission reviews what a lift looks like from the street: the added height, how the new foundation is infilled, and the stairs. Its January 2019 storm preparedness guidelines take raised basements off the table, stating that the commission does not approve a lift on them. Read the HDLC permits guide before the design is drawn, not after.
Jazzy Construction holds LSLBC Residential Construction License #8725, a statewide license worked out of the New Orleans metro. Every public figure on this page comes from a named source with a date, and the foundation work is priced after a walkthrough, never from a phone description.
Where Jazzy Construction fits
A foundation job touches the structure, the plumbing, the electrical work and often the floodplain permit. Running those as separate contracts is how schedules slip and how one trade blames the next.
Jazzy Construction carries the whole job from the first inspection through the permit, the lift and the final sign off, with a single schedule and one person to call. See foundation repair and house raising for what the work includes, or read the renovation cost guide if the foundation is part of a larger remodel.
If the house is still taking on water, start with water damage restoration. Dry the house, then fix what let the water in.
Ready to price it? Get an estimate and we will walk the house and its foundation before anything else.
Common questions
- How much does foundation repair cost in New Orleans?
- HomeGuide puts pier and beam foundation repair at $1,500 to $15,000, with individual piers at $1,500 to $3,000 each, leveling at $1,500 to $10,000 and beam replacement at $1,500 to $4,000. A house here can land above those ranges once sill work or severe rot joins the scope.
- How long does a foundation repair take?
- Most pier and beam foundation leveling jobs run a few days of work under the house, with the schedule set by access, the number of piers and how much sill or beam has to be replaced. A house raising is measured in months because it includes engineering, permits, the lift and the reconnection of every service.
- Do I have to move out during a house raising?
- Usually yes, for the lift itself. The house is separated from its foundation and held on temporary supports, and water, sewer, gas and power are disconnected while that happens. The plan for when you leave and when you return belongs in the schedule before the lift starts.
- Can a slab house be raised in Louisiana?
- Rarely without an engineer's sign off, and it is much harder than lifting a pier house. FEMA P-312 treats a slab foundation as the difficult case and recommends a design professional's evaluation before anything is quoted. Leaving the concrete down and lifting only the frame is the usual answer, and it reshapes walls and every service connection.
- Does homeowners insurance cover foundation repair?
- Typically not for settling or earth movement, which most policies exclude. Sudden events are different, and a flood policy is separate from homeowners coverage. Read your own policy and ask your agent what your deductible and exclusions say before you plan the work.
- How do I know whether to repair the foundation or raise the house?
- Repair when the foundation has failed but the ground is fine. Raise when the house floods repeatedly or sits below the elevation its flood zone requires. The flood map, the parish's freeboard rule and the condition of the framing decide it, and an inspection prices both paths.
Sources
- HomeGuide, Pier and beam foundation repair cost
- HomeGuide, Sill plate replacement cost
- HomeAdvisor, Sill plate replacement cost (2025)
- FEMA P-312, Homeowner's Guide to Retrofitting: elevating your home (copy hosted by City of Norfolk)
- Fixr, Cost to raise a house (updated January 31, 2025)
- Angi, How much does it cost to raise a house (2025 data)
- FloodSmart glossary (BFE, FIRM, freeboard, substantial damage)
- FloodSmart, Rebuild better (ICC)
- FEMA Flood Map Service Center
- City of New Orleans, Floodplain management
- LCG Floodplain Management FAQ
- ASFPM: FY 2026 FMA notice of funding announced (Nov. 2026)
- GOHSEP, Hazard Mitigation Grant Program
- HDLC Guidelines for Storm Preparedness and Resilience (January 2019)
- LSUCCC: Louisiana construction code information (revised Aug. 2026)
- LSLBC contractor search
Rules, programs and prices change. Check the source before you rely on a figure, and ask us to confirm it for your property.